Case Study | Micro-motion Pipeline Detection
Jun 25,2025
Job overview and parameter design
Collaborative unit: Qingdao Institute of Geological Engineering Survey
Operation location: Qingdao, Shandong
Operation task: Pipeline exploration
Operation time: 2023.3.23-2023.3.25
Weather conditions: Sunny
Operation equipment: Guowei GN309
Operation parameters: Collect 2 survey lines on the customer's known survey line. The first two lines use 1m point spacing, 9 stations are arranged as one, and 20 collection stations are used for collection. The required detection depth is 20m
Operation results: The profiles of the first two lines are obviously abnormal and correspond well to the known data
Operation site


Operation site


BLOG
Case Study | Micro-motion Pipeline Detection
Jun 25,2025
CONTACT
Tel: 0086-0551-65327898 / 65327899
Fax: 0086-0551-65327899
E-mail: hfgwe@hfgwe.com
Add: 9th Floor, Building A, G3, Phase II, Innovation Industry Park,No. 2800 Innovation Avenue, High-tech Zone, Hefei city,Anhui Province, China

Mobile website
Hefei Guowei Electronics Co., Ltd.
Subscribe Us
We will contact you within one working day. Please pay attention to your email.
CopyRight:Hefei Guowei Electronics Co., Ltd. Powered by 300.cn SEO