Case Study | Structural Detection in Microseismic Areas (Part 2)
Jun 19,2025
Micro-seismic exploration operations
Operation overview and parameter design
Cooperating unit: Shanxi Third Geological Engineering Survey Institute Co., Ltd.
Operation location: Datong, Shanxi
Operation task: micro-seismic exploration
Operation time: 2022.07.02-2022.07.05
Weather conditions: sunny
Operation equipment: Guowei GN309
Operation parameters: four-fold circular table array, radius 200m-400m-600m-800m, acquisition 120 minutes, sampling rate 4ms, gain 0dB
Operation results: The detection area is located in the Datong Basin. The designed borehole is located at the S3 measurement point in the figure, located at the bottom of the basin. The detection results show high-speed structures on both sides and low-speed structures in the middle, which are consistent with the known stratigraphic structure in the area.
Work site


Job overview and parameter design

BLOG
CONTACT
Tel: 0086-0551-65327898 / 65327899
Fax: 0086-0551-65327899
E-mail: hfgwe@hfgwe.com
Add: 9th Floor, Building A, G3, Phase II, Innovation Industry Park,No. 2800 Innovation Avenue, High-tech Zone, Hefei city,Anhui Province, China

Mobile website
Hefei Guowei Electronics Co., Ltd.
Subscribe Us
We will contact you within one working day. Please pay attention to your email.
CopyRight:Hefei Guowei Electronics Co., Ltd. Powered by 300.cn SEO